Literaturnachweis - Detailanzeige
Autor/inn/en | Geisinger, Robert W.; Coleman, Alvin F. |
---|---|
Institution | Pennsylvania State Dept. of Education, Harrisburg. |
Titel | Year-Round School Research. |
Quelle | (1972), (66 Seiten)
PDF als Volltext |
Dokumenttyp | gedruckt; online; Monographie |
Schlagwörter | Cost Effectiveness; Costs; Educational Economics; Elementary Schools; Extended School Year; Feasibility Studies; Models; Quarter System; School Schedules; Year Round Schools |
Abstract | This report describes the use of a model to compare the costs of two alternatives: initiation of a K-5, 45-15 year-round school, or the construction of an elementary school building in the Annville-Cleona, Pennsylvania, school district. The results of the analysis indicated that the initiation of a 45-15 year round plan would save the district about $89 per pupil of total operating costs in the last 18 years of the 20 year term of the district's bond issue. For the first two years, the savings would be $51 per pupil over the construction of a new building. Although the particular all year school plan analyzed in this situation was the 45-15 program, other specific plans with other pupil attendance arrangements could be analyzed by use of the model. (Author/JF) |
Erfasst von | ERIC (Education Resources Information Center), Washington, DC |