Suche

Wo soll gesucht werden?
Erweiterte Literatursuche

Ariadne Pfad:

Inhalt

Literaturnachweis - Detailanzeige

 
Autor/inLafferty, Mark T.
TitelSoftware Effort Estimation Accuracy: A Comparative Study of Estimations Based on Software Sizing and Development Methods
Quelle(2010), (114 Seiten)
PDF als Volltext Verfügbarkeit 
Ph.D. Dissertation, Capella University
Spracheenglisch
Dokumenttypgedruckt; online; Monographie
ISBN978-1-1240-3648-9
SchlagwörterHochschulschrift; Dissertation; Social Sciences; Computer Software; Databases; Comparative Analysis; Probability; Administrators; Bids; Budgeting; Planning; Research; Methods; Hypothesis Testing; Predictor Variables; Statistical Analysis; Sample Size; Water; Information Technology
AbstractThe number of project failures and those projects completed over cost and over schedule has been a significant issue for software project managers. Among the many reasons for failure, inaccuracy in software estimation--the basis for project bidding, budgeting, planning, and probability estimates--has been identified as a root cause of a high percentage of failures. Poor estimates have not only led projects to exceed budget and go over schedule but also, in many cases, to be terminated entirely. The ability to accurately estimate software development projects changes as newer methodologies replace old ones. Research in this area has been sporadic and there has been little research into the root cause of estimation inaccuracy. The purpose of this study was to determine if there was a difference in software effort-estimation accuracy between the development methodologies of waterfall and incremental methodologies, and the newer agile development methodology. Specifically, the impact of using source line of code (SLOC), function point (FP), or story-point sizing methods were explored across three common development methodologies of waterfall, incremental, and agile. The International Software Benchmarking Standards Group (ISBSG) database was analyzed using Statistical Package for the Social Sciences (SPSS) 15.0 software and examined the relationship between the independent variables (IVs) (estimation parameters) and the dependent variable (DV) estimate accuracy of software projects. Though the hypotheses were not able to be tested, the research question was explored by testing the independent variables through one-way ANOVAs. This resulted in no difference in effort accuracy for the two sizing methods SLOC and FP while there were not enough statistical samples of story-point to determine effect. Similarly, there was no difference in effort accuracy for the two development methods waterfall and agile while there were not enough statistical samples of incremental to determine effect. While limitations existed using the ISBSG database, it is recommended that the database becomes a common tool for future research. [The dissertation citations contained here are published with the permission of ProQuest LLC. Further reproduction is prohibited without permission. Copies of dissertations may be obtained by Telephone (800) 1-800-521-0600. Web page: http://www.proquest.com/en-US/products/dissertations/individuals.shtml.] (As Provided).
AnmerkungenProQuest LLC. 789 East Eisenhower Parkway, P.O. Box 1346, Ann Arbor, MI 48106. Tel: 800-521-0600; Web site: http://www.proquest.com/en-US/products/dissertations/individuals.shtml
Erfasst vonERIC (Education Resources Information Center), Washington, DC
Update2017/4/10
Literaturbeschaffung und Bestandsnachweise in Bibliotheken prüfen
 

Standortunabhängige Dienste
Die Wikipedia-ISBN-Suche verweist direkt auf eine Bezugsquelle Ihrer Wahl.
Tipps zum Auffinden elektronischer Volltexte im Video-Tutorial

Trefferlisten Einstellungen

Permalink als QR-Code

Permalink als QR-Code

Inhalt auf sozialen Plattformen teilen (nur vorhanden, wenn Javascript eingeschaltet ist)

Teile diese Seite: